Free contractor license practice exam 3 with 25 entry-level questions on liens, markup, OSHA, and building code, scored instantly with per-question rationale.
These questions are for study practice only and are not official exam questions.
Question 1
1
In mediation, the mediator's role is to:
Question 2
2
Equipment costs in an estimate typically include:
Question 3
3
Emergency escape and rescue openings (egress windows) are required by the IRC in:
Question 4
4
A 'time and materials' contract is one in which the owner pays:
Question 5
5
If a contractor's annual overhead is $120,000 and expected annual revenue is $1,200,000, the overhead recovery rate is about:
Question 6
6
A smoke alarm is required by the IRC in which locations?
Question 7
7
What is the main purpose of a change order on a construction project?
Question 8
8
The most reliable basis for an accurate estimate is:
Question 9
9
The 'frost line' that affects footing depth is determined by:
Question 10
10
Contracting without a required license in most states can result in which of the following?
Question 11
11
A 'plug number' or allowance in a bid is used when:
Question 12
12
Bearing capacity of soil is important because it determines:
Question 13
13
OSHA's General Duty Clause requires employers to do what?
Question 14
14
A wall is 8 ft tall and 40 ft long. Using 4 ft x 8 ft drywall sheets, how many sheets cover one side (ignore openings and waste)?
Question 15
15
Hurricane ties (framing clips) are used to:
Question 16
16
At what height for construction work does OSHA generally require fall protection?
Question 17
17
General conditions in an estimate refer to:
Question 18
18
A vapor barrier (vapor retarder) in a wall assembly is used to:
Question 19
19
A sole proprietorship exposes the owner to what level of liability for business debts?
Question 20
20
Contingency in an estimate is included to:
Question 21
21
The maximum spacing of anchor bolts connecting a wood sill plate to a concrete foundation is generally:
Question 22
22
A primary advantage of forming a limited liability company (LLC) for a contracting business is:
Question 23
23
A contractor marks up material by 35%. If material cost is $4,000, the marked-up price is:
Question 24
24
A guard (guardrail) is required by the IRC along open sides of walking surfaces more than:
Question 25
25
The maximum opening between balusters in a residential guard is generally:
Enable JavaScript for the interactive step-by-step quiz with instant scoring and explanations.