A GC receives a defective-work claim 4 years after substantial completion in a state with a 10-year statute of repose and a 2-year discovery statute of limitations. The defect was discovered 3 months ago. The claim is most likely:

Question 2

2

An indemnification clause requires the sub to indemnify the GC for losses 'caused in whole or in part by the sub, regardless of whether caused in part by the GC.' In many states, indemnifying another party for that party's own negligence is:

Question 3

3

A contractor bids 320 LF of footing requiring 0.5 CY of concrete per LF, ordered with 7% waste, at $165 delivered per CY. What is the concrete material cost?